The Hidden Costs of Renovating a House
The costs that catch people are the ones behind the plaster: damp (€3,000 to €8,000 to treat), a damp-proof course or tanking (€5,000 to €12,000), asbestos (€5,000 to €15,000 to remove) and subsidence (€10,000 to €30,000 or more to underpin). Hold back 5% to 10% on a light refurbishment, 10% to 15% on a full renovation and 15% to 20% on a gut renovation.
What turns up, what it costs, and what's never in the builder's price.
Free, no obligation. One local company prices it, not five.
- €3,000 to €8,000damp remediation
- €5,000 to €15,000asbestos removal
- 10% to 15%contingency, full renovation
Contingency by level
| Level | Hold back |
|---|---|
| Light refurbishment | 5% to 10% |
| Full renovation | 10% to 15% |
| Gut renovation | 15% to 20% |
| A period house, any level | The top of the range, or more |
What's rarely in the builder's price

- Architect's and engineer's fees.
- Planning fees and the commencement notice, where they apply.
- Rent or a mortgage on somewhere else while you're out.
- Storage for furniture.
- Skips and a parking suspension on a Dublin street.
- Kitchen appliances, light fittings and blinds.
- Landscaping after the builders leave.
How to find them before you start
- A pre-purchase or condition survey by a chartered building surveyor.
- An electrical inspection report.
- A drain camera survey on a house over fifty years old.
- An asbestos survey before any demolition in a house altered between the 1950s and 1980s.
Every guide, calculator and county page
Jump straight to any specification guide, our interactive calculator, the technical glossary or your county page.
Price & Specification Guides
Calculator, FAQ & Glossary
All 26 Counties
More on renovating in Dublin
Costs, old houses, timing and grants.
What it costs in Dublin€330 to €530 per m² light. €670 to €1,330 per m² full.
Cost room by roomA kitchen €15,000 to €25,000. A bathroom €8,000 to €12,000.
Period housesAllow 15% to 25% more. Here's why.
Rewiring and replumbingA rewire with a new water system, €20,000 to €35,000.
How long it takes8 to 12 weeks light, 24 to 36 weeks for a gut renovation.
GrantsUp to €50,000 for a vacant house, €70,000 if derelict.House renovations in every part of Dublin
- Dublin 1 and 748.7% of homes built before 1981
- Dublin 2 and 450.8% of homes built before 1981
- Dublin 846.4% of homes built before 1981
- Pembroke63% of homes built before 1981
- Rathmines75.1% of homes built before 1981
- Ballyfermot73.4% of homes built before 1981
- Cabra66.4% of homes built before 1981
- Finglas61.9% of homes built before 1981
- Artane70.3% of homes built before 1981
- Clontarf71.9% of homes built before 1981
- Donaghmede52.7% of homes built before 1981
- Swords22.7% of homes built before 1981
- Malahide41.5% of homes built before 1981
- Balbriggan28.3% of homes built before 1981
- Rush22.6% of homes built before 1981
- Castleknock30.1% of homes built before 1981
- Blanchardstown13.9% of homes built before 1981
- Ongar14.6% of homes built before 1981
- Lucan18.6% of homes built before 1981
- Palmerstown55.9% of homes built before 1981
- Clondalkin32.6% of homes built before 1981
- Tallaght Central63.8% of homes built before 1981
- Tallaght South25.4% of homes built before 1981
- Firhouse29.6% of homes built before 1981
- Rathfarnham70.3% of homes built before 1981
- Dún Laoghaire61.7% of homes built before 1981
- Blackrock58.1% of homes built before 1981
- Stillorgan52.1% of homes built before 1981
- Dundrum72.1% of homes built before 1981
- Sandyford26.5% of homes built before 1981
- Killiney49.6% of homes built before 1981
Price your renovation
Four taps: the house, how much you're doing, when it was built and the scope. You see our price guide per square metre. Your number is only asked for at the end, if you want one renovation company that covers your part of Dublin to ring you.
Questions people ask
How much should I keep in reserve?
10% to 15% on a full renovation. More in a period house.
What if the builder finds something mid-job?
Ask for it priced in writing before the work is done. Agree how extras are handled in the contract.
Is a survey worth it?
Yes. It costs a fraction of any one of the problems it finds.

Get a price to renovate your house
One renovation company that covers your part of Dublin. Free, no obligation. Nothing starts until you accept a written price.