How Long a House Renovation Takes
On site, a light refurbishment takes 8 to 12 weeks, a full renovation 16 to 24 weeks and a gut renovation 24 to 36 weeks. A modern house runs shorter than a period one. Add the time before the builder starts: design, pricing, and planning permission if the job needs it.
Before the start, the stages on site, and the usual delays.
Free, no obligation. One local company prices it, not five.
- 8 to 12 weekslight
- 16 to 24 weeksfull
- 24 to 36 weeksgut
By level
| Level | On site | On a 150 m² house |
|---|---|---|
| Light refurbishment | 8 to 12 weeks | €50,000 to €80,000 |
| Full renovation | 16 to 24 weeks | €100,000 to €200,000 |
| Gut renovation | 24 to 36 weeks | €200,000 to €400,000 and up |
Before the builder starts

- Survey and design: a month or two.
- Planning permission, if needed: eight weeks for a decision, then four more before work can start, longer if it's appealed.
- Pricing: three or four weeks for a builder to price drawings properly.
- The builder's lead time: good ones are booked months ahead.
The stages on site
- Strip-out and demolition.
- Structural work: steel, walls, floors.
- Roof, windows and doors: the house made weathertight.
- First fix: wiring, plumbing, heating.
- Insulation and plastering.
- Second fix: kitchen, bathrooms, joinery.
- Floors, tiling, decoration.
- Snagging.
What causes delays
- Changes after work has started.
- Something found behind the plaster.
- Windows, kitchens and stone on long lead times, ordered late.
- A wet winter on a job with the roof off.
- Decisions not made: tiles, sockets, door handles.
Every guide, calculator and county page
Jump straight to any specification guide, our interactive calculator, the technical glossary or your county page.
Price & Specification Guides
Calculator, FAQ & Glossary
All 26 Counties
More on renovating in Dublin
Costs, old houses, timing and grants.
What it costs in Dublin€330 to €530 per m² light. €670 to €1,330 per m² full.
Cost room by roomA kitchen €15,000 to €25,000. A bathroom €8,000 to €12,000.
Period housesAllow 15% to 25% more. Here's why.
Rewiring and replumbingA rewire with a new water system, €20,000 to €35,000.
GrantsUp to €50,000 for a vacant house, €70,000 if derelict.House renovations in every part of Dublin
- Dublin 1 and 748.7% of homes built before 1981
- Dublin 2 and 450.8% of homes built before 1981
- Dublin 846.4% of homes built before 1981
- Pembroke63% of homes built before 1981
- Rathmines75.1% of homes built before 1981
- Ballyfermot73.4% of homes built before 1981
- Cabra66.4% of homes built before 1981
- Finglas61.9% of homes built before 1981
- Artane70.3% of homes built before 1981
- Clontarf71.9% of homes built before 1981
- Donaghmede52.7% of homes built before 1981
- Swords22.7% of homes built before 1981
- Malahide41.5% of homes built before 1981
- Balbriggan28.3% of homes built before 1981
- Rush22.6% of homes built before 1981
- Castleknock30.1% of homes built before 1981
- Blanchardstown13.9% of homes built before 1981
- Ongar14.6% of homes built before 1981
- Lucan18.6% of homes built before 1981
- Palmerstown55.9% of homes built before 1981
- Clondalkin32.6% of homes built before 1981
- Tallaght Central63.8% of homes built before 1981
- Tallaght South25.4% of homes built before 1981
- Firhouse29.6% of homes built before 1981
- Rathfarnham70.3% of homes built before 1981
- Dún Laoghaire61.7% of homes built before 1981
- Blackrock58.1% of homes built before 1981
- Stillorgan52.1% of homes built before 1981
- Dundrum72.1% of homes built before 1981
- Sandyford26.5% of homes built before 1981
- Killiney49.6% of homes built before 1981
Price your renovation
Four taps: the house, how much you're doing, when it was built and the scope. You see our price guide per square metre. Your number is only asked for at the end, if you want one renovation company that covers your part of Dublin to ring you.
Questions people ask
Can it be done faster?
With every decision made before the start, yes. Changes on site are what slow jobs down.
When's the best time to start?
Spring, for any job that opens the roof or the back of the house.
What's snagging?
The list of small defects at the end. A sum is held back until they're fixed.