Live In, or Move Out?

Through a light refurbishment of 8 to 12 weeks, most people stay. Through a full renovation of 16 to 24 weeks, most move out for at least the middle of it. Through a gut renovation, everyone does. Living in slows the job, because the builders work around you and make the house safe every evening.

By level, and what to plan either way.

Free, no obligation. One local company prices it, not five.

  • 8 to 12 weekslight: most stay
  • 16 to 24 weeksfull: most move out
  • Weeklysite visits, on a fixed day

By level

LevelStay?Why
Light refurbishmentUsuallyRoom by room. One bathroom always working
Full renovationRarelyNo kitchen, no heating, dust everywhere for weeks
Gut renovationNoNo floors, no power, no water

If you stay

A kitchen extension part way through, with a brick wall, a workbench and dust sheets
  • One sealed room that the builders never enter.
  • A working bathroom at all times, agreed in writing.
  • A temporary kitchen: a microwave, a kettle, a sink.
  • Dust sheets taped at doors, and a vacuum with a fine filter.
  • Children and pets somewhere else during demolition.

If you move out

  • Budget the rent for the full programme, plus a month.
  • Tell your home insurer: an empty house under renovation needs different cover.
  • Storage for furniture, or one dry room kept for it.
  • Visit weekly, on a fixed day, with the builder.

What it does to the price

A builder with a clear house works faster and prices lower. Ask for the job priced both ways. The difference is often close to the rent.

Every guide, calculator and county page

Jump straight to any specification guide, our interactive calculator, the technical glossary or your county page.

Price your renovation

Four taps: the house, how much you're doing, when it was built and the scope. You see our price guide per square metre. Your number is only asked for at the end, if you want one renovation company that covers your part of Dublin to ring you.

What kind of home is it?

It sets the size and the access.

Questions people ask

Can a family with small children live in?

Through decoration and a kitchen, with planning. Not through a rewire and replaster.

How long will I be without a kitchen?

Two to four weeks in a full renovation, if the new one is ordered on time.

Do I need to tell my insurer?

Yes, before work starts, whether you stay or go.

Get a price to renovate your house

One renovation company that covers your part of Dublin. Free, no obligation. Nothing starts until you accept a written price.